12 Hrs
المصدر:
دايلي بيروت
دايلي بيروت
جاهز للتشغيل
جاهز للتشغيل
Lebanese Electric Corporation began excavation work at 8:00 PM on September 17, 2026, in the Boulevard President Saib Salam (Mzaar Square) area near the Total station, to extend electrical cables across the roadway. The work is scheduled to continue until 6:00 AM the following morning. These activities will result in a narrowing of the road. The Internal Security Forces have called on citizens to adhere to the instructions and guidance, and to display traffic signs to facilitate traffic flow and prevent congestion.
تنويه: هذا ملخص تم إنشاؤه بواسطة الذكاء الاصطناعي
comments.heading