19 Hrs
المصدر:
أنا حوا
أنا حوا
جاهز للتشغيل
جاهز للتشغيل
Egypt and Tanzania have implemented the Julius Nyerere Hydroelectric Power Project and Dam, which is considered one of the largest dams in Africa with a production capacity of up to 2,115 megawatts. The project aims to support sustainable development and energy in Tanzania. Egyptian Prime Minister Dr. Mustafa Madbouly and Tanzanian President Samia Suluhu Hassan participated in inaugurating the project, which included inspecting the power station, the dam, and the bridge connecting the banks of the Ruvuma River. The project seeks to strengthen cooperation between the two countries and improve energy resources and infrastructure in Tanzania.
تنويه: هذا ملخص تم إنشاؤه بواسطة الذكاء الاصطناعي
comments.heading