21 Hrs
Source:
الوكيل الإخباري
الوكيل الإخباري
Ready to play
Ready to play
The Greater Amman Municipality is implementing stormwater drainage projects that include the construction of box culverts in several main streets such as Bait Al-Ridwan Street, Marj Al-Hamam, Naur, and Wadi Al-Seer, aiming to improve infrastructure and address water pooling during the winter season. These projects are part of plans to develop drainage networks and facilitate the runoff of rainwater in hotspot areas, with a cost of up to 10 million Jordanian dinars through the tendering of 8 bids, in an effort to reduce flood-causing phenomena.
Notice: This Is an AI-Generated Summary
Comments (0)