السوسنة
السوسنة
Ready to play
Ready to play
The Ministry of Water and Irrigation in Jordan has begun gradually restarting the wells of the Dissi Water Project after a partial shutdown caused by electrical disturbances resulting from strong lightning strikes, which led to the failure of some vital stations. The ministry confirmed that technical teams are working to repair the damages and to recalibrate the pumping system, with an expected stabilization of distribution operations and the resumption of full water supply starting Monday. It also indicated that it is difficult to immediately compensate affected neighborhoods due to the precise water distribution schedules. Citizens are, therefore, urged to conserve water and take precautionary measures to ensure continuous supply during emergency situations.
Notice: This Is an AI-Generated Summary
Comments (0)