2 Hrs
Source:
زاد الاردن
زاد الاردن
Ready to play
Ready to play
The Sahl Houran Municipality has begun implementing a stormwater drainage project with a total cost of approximately 130,000 Jordanian dinars. The project aims to reduce water pooling and improve preparedness for the winter season. It includes practical and sustainable solutions at designated locations, based on precise technical studies, with the goal of enhancing water drainage efficiency and upgrading infrastructure to address water accumulation issues in the targeted areas. This initiative is part of a comprehensive plan to improve stormwater drainage services and meet the community's needs in the region.
Notice: This Is an AI-Generated Summary
Comments (0)