16 Hrs
Source:
معلومات مباشر
Source: معلومات مباشر
16 Hrsمعلومات مباشر
Source: معلومات مباشر
16 HrsReady to play
Ready to play
The Saudi Power Procurement Company has opened prequalification for competition on three solar and wind energy projects under the eighth phase of the National Renewable Energy Program, with a combined capacity of 3,200 megawatts. The projects are Tumair in Riyadh, with a capacity of 900 megawatts; East Al-Amwah in Asir, with 1,000 megawatts; and the Al-Muzayri’ah wind power project in Makkah, with 1,300 megawatts. The projects aim to help reduce reliance on liquid fuels and contribute to renewable energy and storage accounting for around 50% of the electricity mix by 2030.
Notice: This Is an AI-Generated Summary
Comments (0)