البيان
البيان
Ready to play
Ready to play
Dubai’s Roads and Transport Authority has opened the Al Khaleej Street Tunnel, which stretches 1,650 metres between Infinity Bridge and the intersection of Al Khaleej Street and Al Wuheida Street. The tunnel has three lanes in each direction and a capacity of 12,000 vehicles per hour in both directions. It is part of the 13-kilometre Shindagha Corridor Development Project, which includes upgrades to 15 intersections and serves around one million people. By 2030, the project is expected to cut travel time from one hour and 44 minutes to 16 minutes. The project’s construction involved 2,200 workers, engineers and technicians, and recorded around 11 million work hours without injury. Some 77% of the excavated material was reused, and the tunnel will be adorned with a mosaic mural made up of 36 million pieces.
Notice: This Is an AI-Generated Summary
Comments (0)