Ready to play
Ready to play
Turkey has launched a floating platform to process natural gas from the Sakarya field in the Black Sea, aiming to double gas production to 20 million cubic meters per day by 2027. The platform consists of 21 units for gas processing, separation, and transfer, and operates 170 kilometers from the Velayat port, with an expected lifespan of 20 years. So far, the cumulative production from the field has reached 7.23 billion cubic meters, with the potential to double production to 20 million cubic meters daily after adding 10 new wells in the second phase. This project aims to reduce dependence on energy imports and enhance the security of domestic energy supplies, with a focus on developing oil and gas resources to improve national production. Turkey is also striving to increase its oil and gas output to one million barrels per day in future stages.
Notice: This Is an AI-Generated Summary
Comments (0)