جاهز للتشغيل
جاهز للتشغيل
A working session in the Kairouan governorate resulted in the selection of a property located in the Khozazia district of the southern Kairouan delegation for the construction of a new middle school. This decision was made following a comparative study of two proposed sites—one in Al-Khossaoma and the other in Khozazia. The choice was based on a report prepared by the regional education department, which included site inspections and multi-criteria evaluations. The assessment focused on the number of students, the proximity of the site to elementary schools, the reduction of travel distances, and achieving a better balance within the educational catchment area. This decision aims to address the need for educational infrastructure and improve the educational environment in the region.
تنويه: هذا ملخص تم إنشاؤه بواسطة الذكاء الاصطناعي
comments.heading