15 Hrs
المصدر:
الصباح
الصباح
جاهز للتشغيل
جاهز للتشغيل
An electrical wire fault on the second track and ongoing works on the third track caused partial disruption to train movements between Tunis and Jebel Jloud stations. On September 22, the Tunisian National Railway Company relied on a single track between the two stations. The technical departments have confirmed that they will take the necessary measures to restore full train operations on the line as soon as possible.
تنويه: هذا ملخص تم إنشاؤه بواسطة الذكاء الاصطناعي
comments.heading