1 Hr
المصدر:
الصباح
الصباح
جاهز للتشغيل
جاهز للتشغيل
The Tunisian Electricity and Gas Company (STEG) has resumed operating on the two-shift system (winter time) starting today, Tuesday, September 1, 2026, adopting a new schedule for its operations. This change aims to improve work organization and conserve energy. It is part of an adjustment to the timetable based on the season, while continuing to operate throughout the day within two designated time periods.
تنويه: هذا ملخص تم إنشاؤه بواسطة الذكاء الاصطناعي
comments.heading