1 Day
المصدر:
التيار الوطني الحر
التيار الوطني الحر
جاهز للتشغيل
جاهز للتشغيل
excavation work was carried out on the Salim Salam Bridge in Lebanon on October 7 and 8, 2026, with the aim of extending water pipes. This resulted in a temporary closure of traffic lines in the area. drivers are asked to follow security forces' instructions to facilitate movement and prevent congestion, as traffic on the affected routes will be halted during this period from 8:00 a.m. to 4:00 p.m.
تنويه: هذا ملخص تم إنشاؤه بواسطة الذكاء الاصطناعي
comments.heading