1 Day
المصدر:
قناة المنار
قناة المنار
جاهز للتشغيل
جاهز للتشغيل
The construction of the water crossing in the Tyreflessiyeh area in Lebanon has been overseen by the SBR Corporation, which was commissioned by the Ministry of Public Works and Transport. The work includes installing 1200 mm diameter basalt pipes, arranged in 8 rows across the width of the river and 4 pipes in length, on two layers. The next phase involves encasing the pipes with concrete and casting a 20 cm thick concrete slab on top, in preparation for the completion of the remaining stages of the crossing's construction according to technical standards.
تنويه: هذا ملخص تم إنشاؤه بواسطة الذكاء الاصطناعي
comments.heading