13 Hrs
المصدر:
الجمهورية
الجمهورية
جاهز للتشغيل
جاهز للتشغيل
Energy and Water Minister Joo Sadi confirmed that the main problem in the electricity sector lies in the lack of production capacity, which is insufficient to meet more than a third of the demand. He pointed out that this reflects weak infrastructure and a decline in investments in the sector, impacting the stability of the power supply and the speed of meeting the increasing demand. He emphasized that improving production capacity requires additional investments and the development of power plants to ensure a sustainable meeting of the growing electricity needs.
تنويه: هذا ملخص تم إنشاؤه بواسطة الذكاء الاصطناعي
comments.heading