24 Hrs
المصدر:
LBCI Lebanon
LBCI Lebanon
جاهز للتشغيل
جاهز للتشغيل
Beirut and Mount Lebanon Water Establishment has announced a temporary water supply interruption from the Ibrahim River to Jbeil, starting from the morning of September 22, 2026, until the evening of September 24, 2026. This is due to work on connecting the new water network to the existing one as part of the water loss reduction project. Water levels are expected to return to normal immediately after the work is completed and the line is reactivated on September 25. Citizens are urged to ration their water consumption during this period to minimize its impact.
تنويه: هذا ملخص تم إنشاؤه بواسطة الذكاء الاصطناعي
comments.heading