دايلي بيروت
دايلي بيروت
جاهز للتشغيل
جاهز للتشغيل
During the visit of the US Ambassador to Lebanon, Michel Aissa, efforts by the Ministry of Public Works and Transport to implement the emergency plan for rehabilitating infrastructure and reopening roads damaged by recent events were highlighted. The tour included inspecting road clearing operations, debris removal, the construction of a temporary passage on the Qaqaia bridge, and enhancing safety on main roads, all aimed at reconnecting affected areas and restoring mobility between towns. The focus was on facilitating citizen passage and ensuring the continuity of movement, with a plan to turn emergency interventions into permanent infrastructure rehabilitation.
تنويه: هذا ملخص تم إنشاؤه بواسطة الذكاء الاصطناعي
comments.heading