24 Hrs
المصدر:
الشرق اللبنانية
الشرق اللبنانية
جاهز للتشغيل
جاهز للتشغيل
The recent Cabinet session mentioned that the decision to impose fees on solar panels under 1.5 megawatts has been canceled, and the issue of installing these panels is now being referred to the National Electricity Regulatory Authority for the necessary decisions, after consulting the relevant ministries. This effectively terminates the justification for issuing the previous joint decision, No. 1234. The council also confirmed that there are no changes to the status of cellular line installation operations, and the budget is being adjusted to align with the exchange rate without introducing any new fees.
تنويه: هذا ملخص تم إنشاؤه بواسطة الذكاء الاصطناعي
comments.heading