1 Day
المصدر:
التيار الوطني الحر
المصدر: التيار الوطني الحر
1 Dayالتيار الوطني الحر
المصدر: التيار الوطني الحر
1 Dayجاهز للتشغيل
جاهز للتشغيل
The Prime Minister, Nawar Salam, was informed of the cancellation of the decision to organize the installation of solar panels with a capacity of less than 1.5 megawatts, and the matter was referred to the National Electricity Regulatory Authority to take appropriate decisions within its powers after consulting the relevant authorities. Accordingly, it was agreed that the reasons for issuing Joint Decision No. 1234 dated 9/9/2026 are no longer valid, and the decision has been abandoned.
تنويه: هذا ملخص تم إنشاؤه بواسطة الذكاء الاصطناعي
comments.heading