1 Day
المصدر:
التيار الوطني الحر
المصدر: التيار الوطني الحر
1 Dayالتيار الوطني الحر
المصدر: التيار الوطني الحر
1 Dayجاهز للتشغيل
جاهز للتشغيل
Beirut and Mount Lebanon Water Authority will be carrying out connection works to link the new network with the existing one as part of a project to reduce water loss. This will require a water outage on the main pumping line from Ibrahim River to Jbeil, from the morning of August 19 until the evening of August 20, with service expected to resume on August 21. The authority called on citizens to conserve water during the outage period and apologized for the inconvenience caused.
تنويه: هذا ملخص تم إنشاؤه بواسطة الذكاء الاصطناعي
comments.heading