جاهز للتشغيل
جاهز للتشغيل
The Green Iraq Observatory revealed that most water treatment projects across the provinces have exceeded their operational lifespan, with some projects surpassing 25 years, according to the General Audit Bureau. This indicates an urgent need to upgrade these projects to ensure water quality, amidst ongoing challenges in Iraq's water infrastructure.
تنويه: هذا ملخص تم إنشاؤه بواسطة الذكاء الاصطناعي
comments.heading