جاهز للتشغيل
جاهز للتشغيل
The article sheds light on the adoption and implementation of the Fourth Axis Project in Dubai, which extends from Abu Dhabi to Sharjah over a length of approximately 80 kilometers. The initiative aims to improve the transportation network and facilitate movement between the Emirates by constructing 72 bridges, 17 tunnels, and 45 rainwater drainage culverts, all of which contribute to reducing travel time by up to 60%. The project is divided into two phases with an estimated cost of 3.5 billion dirhams for the first phase. Its focus is on supporting logistics transportation, reducing road congestion, and enhancing connectivity between the Emirates, aligning with urban expansion and strengthening Dubai’s position as a global economic hub.
تنويه: هذا ملخص تم إنشاؤه بواسطة الذكاء الاصطناعي
comments.heading