الاقتصادية
الاقتصادية
جاهز للتشغيل
جاهز للتشغيل
Al-Masaneq Al-Kubra for Mining Company "AMAK" announced the discovery of approximately 14 million tons of mineral resources at the "Jabal Qarn" project in the Najran region, with a likelihood that a significant portion will be converted into proven resources as drilling and evaluation activities continue. The estimate includes 11.3 million tons of classified mineral resources, of which 7.1 million tons are in the proven category, along with 2.7 million tons of unclassified materials that may be converted into resources as work progresses. The deposits contain various metals such as zinc, copper, gold, and silver, providing the project with a diverse mineral profile that allows for flexible processing planning. The company anticipates starting production from the classified resources by 2027, while continuing efforts to improve the classification of unconfirmed resources and increase their volume through additional drilling. The final study results will determine the project's economic viability and its progression toward commercial production.
تنويه: هذا ملخص تم إنشاؤه بواسطة الذكاء الاصطناعي
comments.heading