جاهز للتشغيل
جاهز للتشغيل
A Chicago bridge remained stuck in the raised position for over four hours due to heat-induced expansion of its components, causing traffic disruptions downtown. The DuSable Lake Shore Drive bridge, which crosses the Chicago River, became unable to fully close during a scheduled lift, prompting city crews and the fire department to make adjustments and lower it before 2:30 p.m. The incident was attributed to the recent wave of extreme heat in Chicago.
تنويه: هذا ملخص تم إنشاؤه بواسطة الذكاء الاصطناعي
comments.heading