1 Day
المصدر:
Los Angeles Times
Los Angeles Times
جاهز للتشغيل
جاهز للتشغيل
The automated train system at Los Angeles International Airport, designed to improve transportation ahead of the 2028 Olympics, remains incomplete despite extensive testing and being 99.6% finished. The project faces financial challenges and delays, with its $1.2 billion bond downgraded to a negative rating by Fitch Ratings due to the risk of default as the October 8, 2026, deadline approaches. Ongoing disputes between the airport and contractor LINXS, including a lawsuit filed by LINXS, have contributed to setbacks, raising concerns about whether the train will open as planned later in 2026.
تنويه: هذا ملخص تم إنشاؤه بواسطة الذكاء الاصطناعي
comments.heading