جاهز للتشغيل
جاهز للتشغيل
The Harlequin Theatre in Redhill remains closed since September 2023 due to unsafe reinforced autoclaved aerated concrete (RAAC) used in its construction. The local council expects construction to start in November 2026, with a potential reopening possible in about 12 to 15 months, though no firm date has been confirmed. The delay is attributed to additional design works identified during planning, with efforts focused on ensuring a long-term safe reopening for the community.
تنويه: هذا ملخص تم إنشاؤه بواسطة الذكاء الاصطناعي
comments.heading